Abstract
This article shows that very accurate accurate approximations to performance measures in the multiserver M/D/c/c+N queue with finite buffer and deterministic service times can be obtained by replacing the deterministic service time by a two-phase process with exponential sojourn times and branching probabilities outside the interval [0,1]. © 2008 Cambridge University Press.
Original language | English |
---|---|
Pages (from-to) | 653-658 |
Number of pages | 6 |
Journal | Probability in the Engineering and Informational Sciences |
Volume | 22 |
DOIs | |
Publication status | Published - 2008 |